Published October 2026Commercial solar

How to Choose a Commercial Solar Installer in Los Angeles: 10 Questions to Ask

Ten questions to ask any commercial solar bidder in Los Angeles: license, crews, utility experience, structural engineering, sizing, permits, scope, insurance, warranties and references.

Short answer

Choosing a commercial solar installer in Los Angeles is less about the brochure and more about who designs, permits, builds and stands behind the system after permission to operate. Commercial jobs involve structural review, city plan check, utility interconnection and, often, a parking canopy or switchgear work that residential crews never touch. The right questions separate a licensed design-build contractor from a sales desk that subcontracts everything. Use this checklist before you sign.

Commercial rooftop solar racking being installed on a flat warehouse roof in Southern California

Current Energy is a Sylmar-based design-build contractor (CSLB #1074466). We design and build commercial rooftop, carport and related work with our own crews. This guide is written so you can use it with any bidder, including us.

1. Is their CSLB license active, and what classification do they hold?

In California, a contractor working on a commercial solar project must hold an active license from the Contractors State License Board (CSLB). CSLB also says every ad, bid and contract should show the license number, and that seeing a number is not enough: check the status.

For solar work, two specialty classifications matter most:

  • C-46 Solar Contractor — installs, modifies, maintains and repairs thermal and photovoltaic solar energy systems. The classification is limited: the licensee may not perform other building trades except when those trades are required to install the solar system.
  • C-10 Electrical Contractor — places, installs or connects electrical wiring, raceways, conduits and solar photovoltaic cells, among other electrical work.

Ask for the license number, look it up yourself, and note the status, classification(s), address of record and any complaint disclosure on the CSLB page. If the company also proposes battery storage, panel upgrades or structural canopy work, ask which classifications cover each scope and who holds them.

2. Who actually designs and builds the system?

Commercial solar is not one trade. Design, structural engineering, electrical engineering, permitting, installation and commissioning often sit with different people. Ask, in writing:

  • Is design done in-house or by a third-party designer?
  • Are the installers employees of the licensed contractor, or subcontracted crews?
  • Who is the point of contact from first site walk through final inspection?

A sales company that flips the job to unknown subcontractors can leave you with gaps when something needs fixing. Prefer a clear answer on who stamps drawings, who pulls permits and who shows up on the roof or lot.

3. Have they built commercial projects on your utility?

Los Angeles County is a utility patchwork. Most of the City of Los Angeles is on LADWP. Much of the rest of the county is on Southern California Edison (SCE). Burbank, Glendale and Pasadena run their own municipal utilities. Export rules, interconnection paperwork and program options are not the same.

Ask for recent commercial examples in your utility territory, not just residential homes somewhere in SoCal. For a side-by-side of the two big ones, see LADWP vs SCE solar. For LADWP-specific commercial paths (net metering vs Feed-in Tariff), see commercial solar in Los Angeles.

4. Will a licensed structural engineer stamp the design when needed?

Rooftop arrays on warehouses and offices often need a structural review of the roof framing. Solar carports over parking lots need foundation and canopy engineering. Ask:

  • Who provides the structural stamp?
  • Is geotechnical work included when foundations are required?
  • How do they handle roof age, waterproofing and attachment method?

If the roof will not outlast the array, ask how they sequence roof work and solar. A low bid that skips structural reality usually shows up later as change orders or a stalled permit.

5. How do they size the system: bill data or roof square footage?

A commercial system should start with how the building uses power, not with how many modules fit on the roof. Ask for:

  • Review of twelve months of bills or interval data (one recent bill is a start)
  • Your rate schedule and any demand charges
  • Whether the design is sized mainly to on-site load (typical for customer-owned net metering) or to available surface / program rules (common on some LADWP Feed-in Tariff jobs)

If a bidder quotes from square footage alone and cannot explain your tariff, keep shopping. Our commercial solar page describes how we start from the bill and the meter.

6. Who handles city plan check and utility interconnection?

Commercial solar usually runs two tracks in parallel: building/electrical plan check with the city or county, and interconnection review with the utility. Ask who prepares the package, who responds to plan-check corrections and who manages the utility application through permission to operate.

In the City of Los Angeles, building review typically goes through the Department of Building and Safety (LADBS). Other cities and unincorporated LA County have their own departments. Review times vary by jurisdiction, utility and project size, so treat any generic “X weeks total” claim with caution unless it is tied to your site.

For how a parking-lot canopy project moves through those steps, see parking lot solar: how a carport project comes together.

7. What does the proposal include, and what is excluded?

Get at least a few written proposals on the same scope, as CSLB recommends. Compare line by line:

  • Modules, inverters, racking or canopy structure
  • Structural and electrical engineering
  • Permits, inspections and utility fees (who pays which)
  • Roof penetrations, flashing and any required roof work
  • Trenching, switchgear work and service upgrades if needed
  • Monitoring hardware and access
  • Taxes, prevailing-wage assumptions (if they apply to your project) and contingency

Beware of a bid that is far below the others. CSLB notes that an abnormally low bid often means something is missing or will be cut later.

8. What workers’ compensation and liability insurance do they carry?

CSLB states that contractors with employees must carry workers’ compensation insurance, and that the license history page and a Certificate of Insurance are how you verify coverage. Commercial general liability is not always required by law, but on a commercial site you should know how property damage and third-party claims are covered.

Ask for certificates naming your entity as certificate holder where appropriate, and confirm coverage dates match the construction window.

9. What warranties and O&M actually cover after turn-on?

Ask for the written warranty stack, not a verbal “we stand behind our work”:

  • Manufacturer warranties on modules and inverters (and who files claims)
  • Workmanship warranty from the installing contractor (length and what it covers)
  • Who monitors production and who responds when an inverter drops offline
  • Cleaning, vegetation, canopy hardware checks and response times if you want a service agreement

Commercial systems fail quietly when nobody owns monitoring. Clarify who holds login access and who is on the hook for service calls five years out.

10. Can they show completed commercial work you can verify?

Ask for project types that match yours: warehouse roof, office, retail parking canopy, multifamily common-area, airport or industrial. Visit a site if you can, or at least confirm addresses, utility territory and whether the same company still services the system.

Published Current Energy examples include Van Nuys Airport (hangar rooftops and carports) and the Chatsworth commercial building (rooftop array, new carports and EV charging on a Feed-in Tariff project). Use those the same way you would any other bidder’s references: check what was built and who still answers the phone.

Quick comparison checklist

Ask What a solid answer looks like
CSLB license Active number you verified on CSLB; classifications match the scope
Crews Named design-build team; clear on employees vs. subs
Utility experience Recent commercial jobs on LADWP, SCE or your muni
Structural Licensed engineer stamp when the roof or canopy needs it
Sizing Based on bills / interval data and your rate schedule
Permits & interconnection One party owns both tracks through PTO
Scope Written inclusions and exclusions; comparable to other bids
Insurance Current workers’ comp and liability certificates
Warranty & O&M Written workmanship + monitoring owner after turn-on
Proof Verifiable commercial projects, not only residential photos

Next step

If you want a straight read on a Los Angeles or San Fernando Valley commercial site, request a free commercial assessment or call (888) 899-9484. Send one recent utility bill to start. You can also contact Current Energy with questions before you collect bids.

Frequently asked questions

Do I need a C-46 or a C-10 contractor for commercial solar?

Either classification can be involved in photovoltaic work under CSLB’s published scopes: C-46 is the solar specialty license; C-10 is the electrical classification that expressly includes solar photovoltaic cells. What matters for your project is an active license whose classification covers the work in the contract, plus any additional classifications needed for batteries, service upgrades or structural canopy scope. Verify the number on CSLB’s license check.

Should I pick the lowest commercial solar bid?

Not automatically. CSLB advises getting multiple written bids on the same scope and being wary of a bid that is substantially lower than the others. On commercial solar, the gap usually hides missing structural engineering, permit/utility fees, switchgear work or post-PTO service.

Does LADWP vs SCE change which installer I should hire?

It should change which experience you require. An installer who only knows SCE’s Solar Billing Plan may mishandle an LADWP Feed-in Tariff or net metering path, and the reverse is also true. Confirm the utility on your bill first, then ask for commercial references on that utility. Start with LADWP vs SCE solar.

What should I send a commercial solar installer to get a real assessment?

Twelve months of utility bills or interval data, your rate schedule if you have it, roof age or recent roofing docs, a site plan or aerial of the lot if carports are in play, and who owns the building. That is enough for a serious contractor to say whether the site is a strong candidate, a marginal one, or one to revisit after roof or service work.

Disclaimer: This article is for general informational purposes only and is not legal, tax, accounting, financial or engineering advice. Tax credits, incentives, utility programs, rates and rules are set by government agencies and utilities, are complex, and can change at any time; eligibility depends on your specific facts. Figures and program details are as published by the cited sources on the date noted and may not be current. Consult your own tax advisor, attorney and other qualified professionals before making decisions. Current Energy does not guarantee eligibility, savings, incentive amounts, approvals or timelines. Nothing in this article is an offer or commitment by Current Energy; any offer or commitment exists only in a written agreement signed by all parties.