LADWP FiT+ is a competitive-bid program where LADWP buys power from solar-plus-battery projects in the City of Los Angeles under a 20-year contract. A new Tranche A bid window opened October 12, 2026 and closes January 10, 2027 (LADWP). If you own a large roof or parking lot on an eligible LADWP circuit, this is the window to decide whether to bid.

On this page
- What is LADWP FiT+?
- FiT+ vs the standard LADWP Feed-in Tariff
- Who qualifies?
- How FiT+ bids are judged
- Resiliency and Peak Shaving modes
- Costs, deposits and reimbursements to plan for
- How to apply for FiT+ Tranche A
- Check the roof or lot before a 20-year contract
- The federal tax credit
- Talk to a commercial team that knows LADWP
- Frequently asked questions
This guide covers how FiT+ differs from the standard Feed-in Tariff, who qualifies, how bids are judged, and what to have ready before you apply.
What is LADWP FiT+?
FiT+ (Feed-in Tariff Plus) is a pilot that builds on LADWP's original Feed-in Tariff. The key difference: every project has to pair solar with battery storage, so stored solar can be sent to the grid during the hours LADWP needs it most.
According to LADWP:
- LADWP buys energy for up to 20 years under a Competitive Offer Power Purchase Agreement (COPPA).
- The pilot covers up to 35 MW: 10 MW on the 4.8 kV distribution system and 25 MW on the 34.5 kV subtransmission system.
- The capacity is split into three bid tranches, each with a 90-day application window.
- Projects must be inside the City of Los Angeles and connect to an eligible FiT+ circuit.
Sources: LADWP FiT+ page and the FiT+ Pilot Program Guidelines.
FiT+ vs the standard LADWP Feed-in Tariff
| Standard FiT | FiT+ Pilot | |
|---|---|---|
| Technology | Solar | Solar plus battery storage (standalone storage not allowed) |
| How price is set | Published price schedule | Competitive bid: you propose a base price of energy |
| Contract | Up to 20-year standard offer PPA | 20-year Competitive Offer PPA (COPPA) |
| On-site use | Output sold to LADWP | Mostly sold to LADWP; optional Resiliency or Peak Shaving modes allow some on-site use |
| Where | City of LA | City of LA, eligible FiT+ circuits only |
If you already have a FiT project in service or with reserved capacity, LADWP says you may be able to retrofit it with storage and move to FiT+. The new FiT+ contract would replace the old FiT agreement (LADWP).
Who qualifies?
The guidelines set the main rules:
- Size: at least 30 kW-AC. Up to 500 kW-AC on the 4.8 kV system, or up to 10 MW-AC on the 34.5 kV system, measured at the point of delivery.
- Location: one legal parcel, connected to a FiT+ circuit shown on LADWP's FiT+ zone maps.
- One application per site.
- Land use: the project must fall under the existing FiT Master Conditional Use Permit or get its own CUP.
- Battery: the storage system must be on the CEC's approved energy storage list and meet listed safety standards such as UL 9540.
- Peak delivery: the facility must be designed to deliver at least 25% of its energy during peak hours each month.
How FiT+ bids are judged
FiT+ is not first come, first served. LADWP says awards depend on your proposed base price of energy, your energy production profile, your location, and your interconnection costs (guidelines).
A few things shape a competitive bid:
- Time of delivery matters. What LADWP pays is your base price multiplied by a time-of-delivery multiplier, so energy discharged during peak hours is worth more.
- Battery sizing matters. LADWP requires facilities to be designed to deliver at least 25% of their energy during peak hours each month, so the battery has to be sized to shift solar into those hours.
- Interconnection cost is part of the evaluation. A site with lower interconnection costs may be more competitive.
LADWP says there is a minimum of 130 days from bid opening to award: a 90-day submission window, then at least 40 days of review (LADWP FAQ).
Resiliency and Peak Shaving modes
FiT+ projects can be designed for one of two optional modes:
- Resiliency: the facility can power on-site loads during an LADWP grid outage.
- Peak Shaving: the battery can supply your building during certain peak periods to cut grid demand.
There are trade-offs. LADWP says energy used for peak shaving is not paid for because it serves your own load. Only energy discharged to the grid is compensated. Either mode also requires an automatic transfer switch, which may mean electrical rework and a critical-load panel (guidelines).
Costs, deposits and reimbursements to plan for
- Interconnection reimbursement. After commercial operation, LADWP may reimburse part of your interconnection costs: up to $100,000 at 4.8 kV ($150,000 in a disadvantaged community) and up to $400,000 at 34.5 kV ($450,000 in a disadvantaged community), depending on available funding (LADWP).
- Development Security Deposit. The guidelines require a deposit of $100 per kW of project capacity, due within 20 calendar days of being notified of final interconnection costs. Missed milestones can trigger liquidated damages drawn from that deposit.
- A 12-month build clock. Projects must reach commercial operation within 12 months of the contract taking effect. LADWP may grant one extension of up to 12 months at its sole discretion.
How to apply for FiT+ Tranche A
- Check your circuit. Use LADWP's FiT+ circuit map to confirm the site is on an eligible circuit.
- Confirm site control and land use. Check whether the Master CUP covers you.
- Design solar and storage together. Size the battery for peak-hour delivery and decide on Resiliency or Peak Shaving.
- Build your bid. That means your base price, production profile and expected interconnection approach.
- Mail the package. FiT+ requires a hard-copy application mailed to LADWP Feed-in Tariff Program, ATTN: FiT+, 111 N. Hope St, Room L-43, Los Angeles, CA 90012.
Questions about the program go to LADWP at FiT@ladwp.com.
Check the roof or lot before a 20-year contract
A 20-year contract means the roof or carport structure has to last 20 years too. Have roof age and structure evaluated before you bid. If the roof is near the end of its life, plan the replacement first. For parking lots, solar carports can host the array without touching the building.
The federal tax credit
Solar and storage projects may also qualify for federal incentives: up to 30% federal tax credit (6% base; 30% if prevailing wage and apprenticeship rules are met; eligibility varies, consult a tax advisor). Projects must be placed in service by Dec 31, 2027. Subject to eligibility. Your FiT+ build schedule has to fit around that, so see our commercial solar tax credit deadline guide.
Talk to a commercial team that knows LADWP
Current Energy designs and builds commercial solar, carports and battery storage across Los Angeles, including LADWP Feed-in Tariff work. We can look at your roof or lot, your circuit and your on-site load, and help you evaluate whether FiT+, the standard FiT or net metering may fit best. Any project is subject to site evaluation, LADWP acceptance and available capacity, and a written agreement. Learn more about our commercial solar services in Los Angeles.
Get a free site assessment or call (888) 899-9484.
Frequently asked questions
What is the LADWP FiT+ deadline?
The current Tranche A bid window runs from October 12, 2026 to January 10, 2027, according to LADWP. Check LADWP's FiT+ page for any changes.
Can I do battery storage only under FiT+?
No. LADWP says FiT+ doesn't allow standalone storage. Standalone batteries are handled through a separate LADWP DER solicitation.
How big does a FiT+ project need to be?
At least 30 kW-AC, and no more than 500 kW-AC on the 4.8 kV system or 10 MW-AC on the 34.5 kV system.
Can I use FiT+ power in my own building?
Only in Resiliency or Peak Shaving mode. Energy used on-site for peak shaving isn't paid for, and only grid exports are compensated.
Disclaimer: This article is for general informational purposes only and is not legal, tax, accounting, financial or engineering advice. Tax credits, incentives, utility programs, rates and rules are set by government agencies and utilities, are complex, and can change at any time; eligibility depends on your specific facts. Figures and program details are as published by the cited sources on the date noted and may not be current. Consult your own tax advisor, attorney and other qualified professionals before making decisions. Current Energy does not guarantee eligibility, savings, incentive amounts, approvals or timelines. Nothing in this article is an offer or commitment by Current Energy; any offer or commitment exists only in a written agreement signed by all parties.
Considering a FiT+ bid?
Tell us about your roof or parking lot. We’ll look at your site, circuit and on-site load and help you evaluate whether FiT+, the standard Feed-in Tariff or net metering may fit.
Get a free consultation
Solar, battery storage, EV charging, lighting, HVAC and more. Tell us about your project.