Solar Carport EV Charging: How to Plan Both in One Project
What to decide up front when a solar carport and EV chargers share one parking lot: trenching, service capacity, metering, LADWP’s carport incentive EV rules and 2026 charger rebates.
Short answer
If you're putting a solar carport over your parking lot and you expect to add EV chargers in the next few years, design them together now. The canopy columns, trenching, electrical service and utility paperwork are shared, so planning chargers after the steel is up usually means cutting new asphalt and reopening approvals. In LADWP territory there's a second reason: carports that take LADWP's Carport & Canopy Incentive are required to include EV chargers. This guide covers what to decide up front, what each utility requires, and what's changed in 2026.

On this page
- Why solar carports and EV chargers belong in one design
- Does the solar actually power the chargers?
- LADWP: the carport incentive comes with an EV charger requirement
- LADWP and SCE charger rebates in 2026
- Five design decisions to make up front
- Tax treatment
- Work with one team for the canopy and the chargers
- Frequently asked questions
For carport cost, the LADWP incentive amounts and how to compare bids, see our commercial solar carports page. For the step-by-step build process, see how a parking lot solar project comes together.
Why solar carports and EV chargers belong in one design
A carport and a set of chargers compete for the same things on a site:
- Trench routes. Conduit from the far end of the lot back to the electrical room is one of the bigger site-work costs. Running charger conduit in the same trench, even if the chargers come later, avoids digging twice.
- Column and pedestal locations. Chargers can mount on canopy columns or on separate pedestals. Either way, their position affects stall layout, accessible spaces and drive aisles, which is exactly what the canopy design is already working out.
- Electrical service capacity. Solar sends power into your service; chargers pull power from it. Both may push an older service or switchgear toward an upgrade, and it's cheaper to study and size that once.
- Permits and utility review. Building and electrical plan check, plus utility review, can cover both scopes in a coordinated package rather than two separate rounds.
On our Chatsworth commercial building project, the array went on the roof and on two new carports, and eight EV charging stations went in as part of the same Feed-in Tariff project.
Does the solar actually power the chargers?
It depends on how the solar is set up, and this is the part most people get wrong.
- Customer-owned solar on net metering (LADWP) or the Solar Billing Plan (SCE). The system serves the building's own load, so charger use during the day is part of what the solar offsets. Sizing should account for the new charging load.
- LADWP Feed-in Tariff (FiT) carports. Under FiT, you sell the solar output to LADWP under a long-term contract rather than using it on site. LADWP's FiT guidelines also require any chargers installed to meet the carport incentive to be separately metered from the FiT project. The chargers run on your regular utility service, and the canopy's output goes to LADWP.
Neither setup is better by default. The right one depends on your load, your rate schedule and whether the FiT incentive pencils out for your site. Ask any bidder to explain which path they're designing to and why.
LADWP: the carport incentive comes with an EV charger requirement
LADWP's Feed-in Tariff program offers a one-time Carport & Canopy Incentive for new qualifying structures. According to Section 7 of the FiT Program Guidelines, a carport receiving that incentive has to include new EV charging equipment:
- For 25% of the covered parking spaces if the project also receives LADWP's Commercial EV charger rebate.
- For 10% of the covered parking spaces if it doesn't.
- Each charger must deliver at least 6 kW (Level 2) to a vehicle.
- DC fast charger substitution: each DC fast charger of at least 50 kW can replace five of the required Level 2 spaces. If fewer than five are required, one DC fast charger satisfies it.
- If the site is open to the public without controlled access, the chargers must also be publicly available.
- Chargers must be separately metered from the FiT system.
Two more conditions matter for planning. LADWP's power purchase agreement says the required chargers have to stay in operation for the term of the agreement, or the carport incentive must be returned. And per the FiT application, a facility receiving the incentive has to stay operational for at least 10 years. The charger requirement applies to carports, not to canopies that don't shelter vehicles.
What this means in practice: if you want the incentive, the charger count, metering and public-access question have to be in the design before you apply, not added afterward. The incentive is also subject to available funding and queue position, so it isn't guaranteed for every project or for the full project size.
LADWP and SCE charger rebates in 2026
LADWP Commercial EV Charger Rebate. The program helps offset the cost of buying and installing chargers at commercial, industrial and multifamily common-area sites. As of LADWP's program page (last updated August 13, 2026), applications are closed, and LADWP says it's planning an enrollment in October 2026 with revised terms, funding amounts and documentation requirements. The last published rules (still posted when we rechecked the page on October 17, 2026) included:
- Level 2 rebates of up to $5,000 per charger in a Disadvantaged Community and $4,000 elsewhere, for chargers of at least 6.2 kW.
- DC fast charger rebates by power tier, up to $125,000 per charger in a Disadvantaged Community.
- Dynamic load management is allowed, as long as no Level 2 charger drops below 8 amps under the worst-case scenario.
- Chargers must be installed by a licensed electrical contractor, hardwired and kept in service for at least five years.
Because the next enrollment comes with revised terms, treat those figures as the last published version, not a promise. LADWP also asks for a Customer Submittal Package to its EV Service Design Group before chargers go in, so it can check whether utility infrastructure needs upgrading. That submittal is open year-round, so it's worth starting early.
SCE Charge Ready. SCE's Charge Ready business programs are no longer accepting applications. SCE says existing participants must have fully signed agreements by December 31, 2026. If your site is on SCE, plan the chargers on their own merits rather than counting on that program.
Federal charger credit. The federal Section 30C credit for EV charging equipment doesn't apply to property placed in service after June 30, 2026, according to the IRS. Chargers going in now shouldn't be budgeted against it.
Five design decisions to make up front
- How many chargers now, and how many later? Decide the day-one count and the future count. Run conduit, and leave panel space and capacity, for the future count during the carport build.
- Level 2, DC fast, or both? Level 2 suits employees, tenants and anyone parked for hours. DC fast charging suits short visits and fleets but needs far more capacity per charger. Under LADWP's FiT rule, a DC fast charger can stand in for five Level 2 spaces.
- Load management. Managed charging lets chargers share available capacity instead of each drawing full power at once. That can reduce how much service upgrade the site needs. Your electrical designer should confirm what's allowed for your site and any rebate you're applying for.
- Metering. Decide whether chargers sit on the building's existing meter or on their own meter. For LADWP FiT carports taking the incentive, separate metering is required.
- Access and accessibility. Who can use the chargers (staff only, tenants, the public), and how accessible EV spaces will be laid out. California's accessibility rules also cover EV charging spaces, so accessible charger stalls belong in the canopy layout from the start.
If your service is already near capacity, an upgrade may be part of the project either way. Our panel upgrades page explains what that involves.
Tax treatment
Business-owned solar may qualify for an up to 30% federal tax credit (6% base; 30% if prevailing wage and apprenticeship rules are met; eligibility varies, consult a tax advisor). Projects must be placed in service by Dec 31, 2027. Subject to eligibility. Carports raise a specific question for your advisor: how much of the canopy structure counts toward the credit. The EV chargers themselves are a separate question, and the federal charger credit has ended for chargers placed in service after June 30, 2026.
Work with one team for the canopy and the chargers
Current Energy designs, permits, builds and services commercial solar, carports and EV charging from Sylmar with in-house crews (CSLB #1074466). On a carport site we look at the utility on your bill, your service capacity, the lot layout and your charging plans together, so the trench, the steel and the chargers only get built once.
Get a free site assessment or call (888) 899-9484. Send a recent utility bill and a site plan or aerial of the lot, and tell us roughly how many chargers you're thinking about.
Frequently asked questions
Can EV chargers be mounted on a solar carport?
Yes. Chargers can mount on canopy columns or on nearby pedestals, with conduit run during the carport build. The structural and electrical design should account for them before plan check, even if the chargers are installed later.
Does LADWP require EV chargers on solar carports?
Only if the carport receives LADWP's Feed-in Tariff Carport & Canopy Incentive. Then new chargers of at least 6 kW are required for 10% of covered parking spaces, or 25% if the project also takes LADWP's Commercial EV charger rebate, and they must be separately metered. Carports not taking the incentive don't have that requirement.
Will my solar carport power the EV chargers directly?
On customer-owned solar under net metering or SCE's Solar Billing Plan, the system offsets the building's load, including chargers. On an LADWP Feed-in Tariff carport, the solar output is sold to LADWP and the required chargers are metered separately, so they run on your regular service.
Is there still a federal tax credit for commercial EV chargers?
Not for new installs. The IRS says the Section 30C charger credit doesn't apply to property placed in service after June 30, 2026. Solar on the same project may still qualify for the federal solar credit, subject to eligibility; consult a tax advisor.
Disclaimer: This article is for general informational purposes only and is not legal, tax, accounting, financial or engineering advice. Tax credits, incentives, utility programs, rates and rules are set by government agencies and utilities, are complex, and can change at any time; eligibility depends on your specific facts. Figures and program details are as published by the cited sources on the date noted and may not be current. Consult your own tax advisor, attorney and other qualified professionals before making decisions. Current Energy does not guarantee eligibility, savings, incentive amounts, approvals or timelines. Nothing in this article is an offer or commitment by Current Energy; any offer or commitment exists only in a written agreement signed by all parties.
Planning a carport with chargers?
Send a recent utility bill and a site plan or aerial of the lot, and we’ll look at the canopy, service capacity and charging plan together.