Commercial electrical service upgrades for solar, storage and EV
Solar, storage, EV charging and electrified equipment all land on the same service. We establish what your building can carry before anything is designed — and tell you when an upgrade can be avoided.
The deadline is real. So are our specialized skills and resources.
Rated 4.8★ from 33 reviews · CSLB #1074466 · In-house crews · 200+ MW designed, engineered and installed
The bottleneck in every commercial electrification project
Add solar, a battery, chargers and new equipment to a building one at a time without checking, and at some point a project stops because the service cannot legally carry the load. Establishing capacity at the start is cheap; discovering it mid-installation is not.
On a multifamily garage in North Hollywood, the work included a dedicated EV panel with a breaker labelled for each charger and new conduit runs.



What we do
Service and panel work
- Load calculations for the whole building
- Dedicated panels for EV charging and new loads
- Utility coordination and permitting handled
Capacity without an upgrade
- Load management for charger groups
- Interconnection options assessed for solar
- Storage sized so new loads don’t set a new peak
Before you spend on an upgrade
A service upgrade is a real expense and it is not always necessary. We run the load calculation first, because load management or a different interconnection approach can sometimes deliver the same outcome. If you do need the upgrade, you will know why, with numbers.
Planning chargers? See commercial EV charging. Adding storage? See commercial battery storage.
Questions we get asked
How do I know if my building needs a service upgrade?
A load calculation for the building, with your planned solar, storage, chargers and equipment included, gives the definite answer. We run it before specifying anything.
Can load management avoid a service upgrade for EV charging?
Often. Chargers parked for hours rarely all need full power at once, so automatic load management can share available capacity and avoid an upgrade on many workplace and multifamily projects.
Who coordinates with the utility?
We do. Utility coordination and permitting are part of the scope, and they usually set the schedule more than the electrical work itself.
Will the power be off during the work?
Service work needs a planned shutdown. We schedule it with you in advance so tenants and operations can plan around it.
Related
Big jobs need specialized skills and resources. We have both.
Send us your single-line or a photo of the main switchgear.
With a recent bill, that is usually enough to tell you what your service can carry and what it would take.