Commercial EV charging your electrical service can support
For workplaces, fleets, retail, hotels and multifamily garages. We start with service capacity and the conduit route, because those — not the charger — decide the budget and the schedule.
The deadline is real. So are our specialized skills and resources.
Rated 4.8★ from 33 reviews · CSLB #1074466 · In-house crews · 200+ MW designed, engineered and installed
The constraint is never the charger
Almost every commercial charging project is decided by two things: how much spare capacity the electrical service has, and how far the conductors have to travel to reach the parking spaces. We assess those first. It changes the design, the budget and sometimes the answer.
Recent garage work includes a senior housing garage in West Los Angeles — wall-mounted chargers with bollards and surface conduit — and a multifamily garage in North Hollywood with a dedicated EV panel.



What we install
Level 2 (208/240V)
- Workplaces, multifamily parking, hotels and retail
- Networked or non-networked
- Load management, access control and billing where you want them
DC fast charging
- Fleet depots, retail and corridor sites
- 480V three-phase with substantial service capacity
- Utility work scoped honestly before you budget
Load management instead of a service upgrade
If eight chargers are installed as eight dedicated full-capacity circuits, the calculated load often exceeds the building’s service and triggers an upgrade. But eight cars parked for hours do not all need full power at once. Automatic load management shares available capacity across chargers, and on workplace and multifamily projects it is frequently the difference between a project that proceeds and one that is shelved. If an upgrade is needed, see commercial electrical service upgrades.
Apartments and HOAs
Multifamily properties have tenant-rights rules and assigned-versus-amenity decisions of their own. See EV charging for multifamily property managers and multifamily & HOA solar.
Workplace charging also aligns naturally with midday solar, and storage can buffer charging so it doesn’t set a new demand peak — see commercial battery storage.
Questions we get asked
Level 2 or DC fast charging for my business?
Level 2 runs on 208/240-volt AC and adds range over hours — right for workplaces, apartments and hotels where vehicles sit anyway. DC fast charging adds range in minutes and suits retail, fleet depots and corridor sites, but costs far more and needs far more electrical capacity.
Will my building’s service handle chargers?
Frequently ‘not as designed, but yes with load management.’ We assess the service before specifying equipment, not after.
How long does a commercial EV charging project take?
The equipment is rarely the constraint. Utility service work, trenching or conduit routing, permitting and — for larger installations — a utility capacity study set the schedule. We give a realistic timeline that includes those.
Can charging be tied to solar and storage?
Yes, and on new projects it should be designed that way from the start, so charging aligns with solar production and storage avoids demand-charge spikes.
Do you install chargers in parking garages?
Yes. Our garage work includes wall-mounted chargers with bollards, dedicated EV panels and surface conduit runs.
Related
Big jobs need specialized skills and resources. We have both.
Tell us how many spaces and what is on the meter.
Send a recent bill and a rough parking layout, and we will tell you what your service can support before anyone picks a charger.