Home electrical panel upgrades — and when you don’t need one
Solar, a battery, an EV charger and a heat pump all land on your home’s electrical service. We find out what yours can carry first, and tell you when an upgrade can be avoided.
Rated 4.8★ from 33 reviews · CSLB #1074466 · In-house crews · 200+ MW designed, engineered and installed
The quiet bottleneck in older homes
Much of the older housing stock across the San Fernando Valley and Los Angeles has 100-amp service and panels with no spare capacity. Add solar, a battery, a charger or a heat pump without checking, and a project can stop on installation day.
For current market ranges and the Los Angeles permit path, see our panel upgrade cost guide.



What we do for homes
Service and panel upgrades
- 100A to 200A service upgrades
- Main panel and meter main replacement
- Obsolete and unsafe panel replacement
- Utility coordination and permitting handled
Capacity without an upgrade
- A load calculation that shows what you really need
- Line-side tap solar interconnection where permitted
- Load management for EV and heat-pump circuits
- Sub-panels for garages, ADUs and workshops
Before you spend on an upgrade
A service upgrade is a real expense and it is not always necessary. We run the load calculation first, because a line-side tap or a load-management device sometimes delivers the same outcome. If you do need the upgrade, you will know why.
Planning more than one project? See home EV charger installation, home battery storage and HVAC & heat pumps.
Questions we get asked
How do I know if I need a panel upgrade?
Common signals: a 100-amp service with no spare breaker positions, a fuse box rather than breakers, a panel brand with a known safety history, scorching or buzzing, or a plan to add solar, a battery, an EV charger or a heat pump. A load calculation gives the definite answer.
Can I add solar without upgrading the panel?
Often, yes. A line-side tap connects the system ahead of the main breaker and can avoid an upgrade. Load management devices are another route. It depends on your equipment and your local inspector, so we assess before designing.
How long does a home service upgrade take?
The electrical work itself is typically a day. Permitting and utility coordination for the disconnect and reconnect set the schedule, and they vary by utility and time of year.
Will the power be off?
Yes, for part of the day, because the service has to be disconnected to be replaced. We schedule it and tell you in advance so you can plan around refrigeration, work-from-home and medical equipment.
Related
Send us a photo of your main panel.
It is usually enough for us to tell you whether your plans need an upgrade, and what it would involve.